PACKAGING AND TRANSPORTATION

1. SCOPE OF DELIVERY
The boiler is delivered fully assembled.
- When receiving the delivery, check if the packaging is intact.
- Check that all the items listed in Table 2 are included in the

delivery.

2. TRANSPORTING THE BOILER

CAUTION:

The boiler may be damaged when it is improperly

secured.
- Only transport the boiler using the right transportation

equipment, such as a handtruck with a fastening belt or
special equipment for maneuvering steps.

- During transportation the boiler must be secured on the

transportation equipment to prevent it from falling off.

- Protect all parts against impacts if they are to be

transported.

- Observe the transportation markings on the packaging.
- Packaged boilers must always be lifted and carried to

their destination by two people, or you must use a handtruck
or special equipment to transport them to their destination.

- Transport the boiler to the room where it is to be installed.

Pos. Parts

Quantity Packaging

1

Boiler with casing

1 1 box

2

Wall bracket

1

3

Technical documents

1

including:
- User’s Instructions
- Installation Instructions
- Wall Mounting Template

4

Top manual air vent drain pipe

1

5

Gas shut off valve

1

6

Flue gas adaptors including:

1

- vent adaptor for two pipes
vent system
- intake air adaptor for two pipes
- 3” adaptor
- 4 screws

7

LPG conversion kit

1

- injector black coated
- LPG sticker
- LPG conversion labelling
- Conversion instructions

3. BOILER BOX CONTENT (Table 2)

1

2

5

6

4

3

5.90"

3.35"

1.38"

XPak 120 - 17.81"

XPak 85 - 15.75"

14.17"

16.25"

C/C

16"

1 . 5 "

3.54"

inside 3"

inside 3.15"

4,53" Hole for 60/100mm coaxial vent

30.71" Boiler height

3.14"

XPak
120

XPak
85

XPak
85

XPak
120

Ø1/4" holes for earthquake restraint (2 places)

IN 3/4" NPT male

OUT 3/4" NPT male

Gas shut off valve (supplied)
3/4" NPT female

Condensate piping flexible (supplied)
4/5" female

Boiler outline

Boiler bracket
(supplied)

Ø1/4" holes
for 5/16" lag
screws (4 places)

XPak
120

XPak
85

Inlet air either right or left

3" vent adaptor (supplied)

3" inlet air adapter (not supplied)

Exhaust vent adapter (supplied)

Screw (2x) (supplied)

Screw (2x) (supplied)

Screw (2x) (fitted)

Inlet air adapter (supplied)

Wall stud

CENTER LINE

OF BOILER

L

C

Ensure there is adequate clearances for mounting the boiler (details given in
installation instructions).
The wall mount bracket is designed for a stud spacing of 16 inches from
center. For other stud spacing a solid mounting surface must be provided by
the installer.
Do not mount the boiler to a hollow wall. Be sure to mount the boiler to the
studs only.
Mount the wall bracket using 4 5/16" lag screws. Ensure the bracket is level
when mounted.
Extreme care is needed to ensure the bolts are secured in the studs.
Hang the boiler on the bracket and secure the bottom of the boiler with two (2)
additional lag screws.

This boiler is heavy and awkward to lift. It is
recommended and safer to install the boiler with two
people. Use caution as to not drop this boiler which
could cause personal injury. Verify that the boiler is
securely mounted before leaving the boiler unsupervised.

WARNING

Pressure relief valve drain
3/4" NPT female

Fig. 5

7

Refer to Fig. 5 for Boiler box contents.

Advertising