Raypak XPAK 85 User Manual

Page 42

Advertising
background image

42

16. FINAL CHECKS
- ENSURE ALL TEST NIPPLES ON THE APPLIANCE GAS VAL-

VE ARE TIGHT AND CHECKED FOR TIGHTNESS.

- ENSURE THE APPLIANCE FLUE SYSTEM IS INSTALLED

CORRECTLY AND IS PROPERLY SECURED.

- ENSURE ALL PIPE WORK IS RE-CHECKED FOR

SOUNDNESS.

- REATTACH APPLIANCE CASING.
- COMPLETE CHECKLIST
Complete details of the boiler, controls, installation and
commissioning in the checklist at the back of this book. It is
important that the checklist is correctly completed and handed to
the user. Failure to install and commission the appliance to the
manufacturers instructions may invalidate the warranty

.

17. INSTRUCTING THE USER
Hand over all documentation supplied with this appliance –
including these instructions – and explain the importance of
keeping them in a safe place.
Explain to the user how to isolate the appliance from the gas,
water and electricity supplies, and the locations of all drain points.
Show the user how to operate the appliance and any associated
controls correctly.
Show the user the location of any isolating valves and the location
of all manual air release points.
Explain to the user how to turn off the appliance for both long and
short periods and advise on the necessary precautions to prevent
freeze damage.
Explain to the user that for continued safe and efficient operation,
the appliance must be serviced annually by a qualified service
person.

18. WARRANTY

T

o validate the appliance warranty, it’s necessary to register the

appliance details with us. The warranty can be registered in
several ways, see last pages of this manual for details.

Advertising