Stainless steel 3” vent system, Us + canada, Stainless steel vent system – Raypak XPAK 85 User Manual

Page 30

Advertising
background image

30

Stainless Steel 3” Vent System

1

US + CANADA

Vent System - Room Air independent Operation (Sealed Combustion Operation) - Fig. 12-14-15-17

Vent System diameter

3”

Vent system material

Stainless steel

Two pipes vent adaptors (included with the boiler)

-

-

adaptor 80 mm > 3” (included with the boiler 1 pcs) for flue

-

-

adaptor 80 mm > 3” for intake air

Field supplied

Order No.

Combustion air intake vent material

3

Field supplied

Order No.

ULC/UL listed

1

Stainless steel Vent material

45° elbow EqL = 2 ft / 0,6m

Field supplied

Order No.

90° elbow EqL = 3 ft / 0,9m

Bird Screen c/w Termination

Field supplied

Order No.

Venting support

2

dia. 3”

Field supplied

Order No.

1

stainless steel vent material must be ULC/UL listed, stainless steel AL29-4C

®

for category IV boilers. Sources FasNseal – Protech

System Inc.

2

Order Mounting Clip for each straight length of vent pipe installed, boiler can not support weight of vent system

3

allowable material for combustion air ABS – CPVC – PVC or stainless steel

- Do not exceed maximum equivalent vent length.
- Always follow XPak Venting System Installation Instructions.

Tab. 7

Stainless Steel Vent System

1

US + CANADA

Vent System - Room Air Dependent Operation - Fig. 13-16-18

Vent System diameter

3”

Vent system material

Stainless steel

Adaptor for room air dependent operation

3

013102

Order No.

adaptor 80 mm > 3” (included with the boiler 1 pcs)

-

-

ULC/UL listed

1

Stainless steel Vent material

45° elbow EqL = 2 ft / 0,6m

Field supplied

Order No.

90° elbow EqL = 3 ft / 0,9m

Bird Screen c/w Termination

Field supplied

Order No.

Venting support

2

dia. 3”

Field supplied

Order No.

1

Stainless steel vent material must be ULC/UL listed, stainless steel AL29-4C

®

for category IV boilers. Sources FasNseal –

Protech System Inc.

2

Order Mounting Clip for each straight length of vent pipe installed, boiler can not support weight of vent system

3

Provide a proper air opening in the room (size according indication pg. 7)

- Do not exceed maximum equivalent vent length.
- Always follow XPak Venting System Installation Instructions.

Tab. 8

Advertising