Site Requirements and Prerequisites

2-1

Chapter 2
Installation and Setup

This chapter provides the following information for the ASMi-31 standalone
model:

Site requirements and prerequisites

Package contents

Instructions for mechanical installation

Instructions for electrical installation.

After installing the unit, refer to Chapter 3 to assure normal operation.
In case a problem encountered, refer to Chapter 4 for test and diagnostic
instructions.
Refer to Chapter 5 for additional information on the ASMi-31/R card
version.

2.1 Site Requirements and Prerequisites

Power

AC-powered ASMi-31 units should be installed within 1.5m (5 ft) of an
easily accessible grounded AC outlet. The outlet should furnish 115 VAC or
230 VAC.

DC-powered ASMi-31 units require -48 VDC power source, which must be
adequately isolated from the mains supply.

Allow at least 90 cm (36 in) of clearance at the front for operating and
maintenance accessibility.

Allow at least 10 cm (4 in) clearance at the rear of the unit for signal lines
and interface cables.

Ambient
Requirements

The ambient operating temperature of ASMi-31 is 0 to 50°C (32 to 122°F)
at relative humidity of 90%, non-condensing.