Maintenance – Tiger NEW HOLLAND T6000 User Manual

Page 123

Advertising
background image

MAINTENANCE

Saber

Maintenance Section 4-15

©2012 Alamo Group Inc.

MAINTENANCE

GREASING POINTS ON BOOM AND PIVOT

Locate grease zerks (8) on deck pivot assembly, (2) on the deck end of secondary boom, (2) at main/
secondary boom joint, and (2) at swivel end of main boom. Inject Lithium-Complex Extreme Pressure grease
conforming to NLGI2-ISO 320 specifications until grease begins to protrude from ends.

SABER

Advertising