Assembly, Cooler mounting - side tank, Swivel bracket mounting – Tiger NEW HOLLAND T6000 User Manual

Page 62: Main boom installation

Advertising
background image

ASSEMBLY

Assembly Section 2-30

COOLER MOUNTING - SIDE TANK

Mount the cooler mounting brackets on the top rear side of the side hydraulic tank.

Locate the bolt plates on the top of the tank and secure the appropriate cooler bracket to
the tank with the hardware provided. Attach the screen and cooler to the brackets. Refer
to the Parts Section to attach the hoses and adapters to the cooler.

(ASM-C-0092)

SWIVEL BRACKET MOUNTING

Install the boom swivel bracket onto the boom mounting bracket with the swivel pin. Secure

the pin in place using the capscrews, etc. through the hole in the boss and pin. NOTE: The head
of the capscrew must be toward the front of the tractor.

Install all new swivels and fittings on the swing cylinder with swivel openings facing each

other. Fittings will vary in type and direction depending on your application, refer to your parts
section for more details.

Install bearings in the main frame anchor for the swing cylinder. This may already be done

for you.

Install the swing cylinder between the boom mounting bracket cylinder anchor and the boom

swivel with the pins. Insert roll pins through the top and the bottom hole in the pins.

Now the hoses can be attached from the control valve to the swing cylinder.

(ASM-C-0015)

MAIN BOOM INSTALLATION

Install the boom swivel into the main frame as shown in the parts section using a hoist. Line up holes

in swivel and main frame for large swivel pin and insert pin. Secure with hardware as shown.

Attach the inner end of the main boom to the swivel bracket with the cylinder anchors positioned

upward, and at a right angle to the tractor. Secure it with the horizontal hinge pin. Secure the hinge pin in
the boss with capscrews, etc. (see Parts Section).

Attach the butt end of the main boom cylinder to the swivel with the cylinder pin and roll pins shown in

the Parts Section.

Install the travel lock on the rod end of the main boom cylinder. This should be facing the butt end of

the cylinder after installation.

Install the fittings and hoses to the main boom cylinder per Parts Section.

GREASE HINGE PIN ZERKS ON BOOM AFTER ASSEMBLY, ONCE UNDER LOAD WITH BOOM

ELEVATED AND AGAIN AT REST WITH BOOM SUPPORTED

(ASM-C-0013)

Advertising