Maintenance, Daily maintenance schedule – Tiger NEW HOLLAND T6000 User Manual

Page 139

Advertising
background image

MAINTENANCE

Saber

Maintenance Section 4-31

©2012 Alamo Group Inc.

MAINTENANCE

DAILY MAINTENANCE SCHEDULE

The following services should be performed daily or every 8 hours of service, following the detailed
maintenance instructions in the operators manual.

_______ Pump Drive Shaft: If required with drive shaft/coupler check for end play and lubricate at zerks.

_______ Crankshaft adapter: If equipped with rubber grommets check condition, replace if missing or

damaged.

_______ Pivot points: Inject grease until it appears at ends.

_______ Hydraulic fittings: Check for leaks with paper or cardboard. Tighten fittings or replace hoses

immediately.

_______ Knives: Inspect for missing or damaged knives, change (only complete sets) as needed.

_______ Knife Bolts (SABER 1-3/4”): Check/Torque to 2,000 ft. lb.

_______ Bolts - Disk/Spindle (SABER 3/4” x 2”): Check/Torque to 331 ft. lb.

_______ Belts: Check/Tighten/Replace belts as needed.

_______ Main Frame/Deck: Unless otherwise specified retorqued bolts according to torque specifications in

this section.

_______ Hydraulic Fluid Level: Add, if required, per fluid recommendations.

_______ Rear Flail Drive, Bearing Flange and Shaft Couplers: Grease as instructed in the detailed

maintenance section.

_______ Cutter Shaft and Ground Roller: Grease as instructed in the detailed maintenance section.

Service performed by:_______ Date:____/____/____ Hour

Meter:________

Maintenance Section

**This page may be copied and used as part of the daily maintenance routine.

Advertising