Toshiba CARRIER RAV-SP300AT2-UL User Manual

Page 93

Advertising
background image

– 93 –

No.

‡

Part name

Compressor

Compressor lead

Procedure

1. Removal of broken compressor

1) Recover the refrigerant gas.
2) Perform work of Detachment 1 of



,

‚

,

ƒ

and

„

.

3) Remove the wiring guide (vertical).

Take off screw of the wiring guide (vertical) and

volve fixing plate. (M4, 8 mm, 1 pc.)
Take off screw of the wiring guide (vertical) and

piping panel (Front). (M4, 8 mm, 1 pc.)

4) Remove the wiring division panel.

Take off screw of the wiring division panel and the

inverter assembly. (M4, 8 mm, 1 pc.)
Take off screw of the wiring division panel and the

valve fixing plate. (M4, 8 mm, 1 pc.)

5) Remove the piping panel (Front).

Remove screws of the piping panel (Front) and the

bottom plate. (Hexagonal screw M4, 10 mm, 2 pcs.)
Remove screws of the piping panel (Front) and the

piping panel (Rear).

(Hexagonal screw M4, 10 mm, 1 pc.)

6) Remove the piping panel (Rear).

Remove screws of the piping panel (Rear) and the

bottom plate. (Hexagonal screw M4, 10 mm, 2 pcs.)

7) Remove the valve fixing plate.

Remove bolts of the valve.

(Hexagonal screw M6, 15 mm, 4 pcs.)
Remove screws of the valve fixing plate and the

partition plate. (M4, 8 mm, 1 pc.)
Remove screws of the valve fixing plate and the

accumulator. (M4, 8 mm, 1 pc.)
Cut off the bundling band for the discharge pipe and

the suction pipe and then remove each sensor and coil

lead of PMV.

8) Remove the sound insulating plate.

(Upper side, outer winding, inner winding)

9) Remove terminal cover from the compressor and

then remove the compressor lead and also the

compressor case thermo.

10) Remove TD sensor fixed to the discharge pipe.
11) Remove the compressor lead.

(Leave the ferrite core attached to the electric

parts box as it is.)

Control P.C. board
U : CN200

Red

V : CN201

White

W : CN202

Black

(Tightening torque: 1.47 ± 0.1 N•m)

Remarks

Bundling band

Bundling band
for heat proof

for heat proof

TD sensor

TD sensor
Compressor lead

Compressor lead

Pipe cover

Pipe cover

Compressor

Compressor
case thermo

case thermo

Piping panel (Rear)

Piping panel (Rear)

Piping panel (Front)

Piping panel (Front)

Bundling band
for heat proof

TD sensor
Compressor lead

Pipe cover

Compressor
case thermo

Piping panel (Rear)

Wiring

Wiring
guide

guide

Valve fixing plate

Valve fixing plate

Wiring
guide

Valve fixing plate

Piping panel (Front)

Compressor lead

Compressor lead

Compressor lead

Compressor lead

Control P.C. board

Control P.C. board

Ferrite core

Ferrite core

Compressor lead

Compressor lead

Control P.C. board

Ferrite core

Pipe cover,
bundling band

TS sensor

Black pipe cover for heat proof,

bundling band for heat proof,

each sensor

(TL, TO, TE, TD, TS sensors)

PMV coil lead

Pipe cover,

Pipe cover,

bundling band,

bundling band,

each sensor

each sensor

(TL, TO, TE, TD,

(TL, TO, TE, TD,

TS sensors)

TS sensors)

PMV coil lead

PMV coil lead

Discharge pipe

Discharge pipe

Suction

Suction
pipe

pipe

Accumulator

Accumulator

Pipe cover,

bundling band,

each sensor

(TL, TO, TE, TD,

TS sensors)

PMV coil lead

Discharge pipe

Suction
pipe

Accumulator

Advertising