Installation adjustment – TOA Electronics EX-16 User Manual

Page 27

Advertising
background image

4. Installation Adjustment

4.1 Inspect Before Turning Power On.

* Before supply power, check the power connections (power connections

should be complete) and the fuse. Also, voltage selector should be set

correctly. All modules should be in place.

Check the ROM on the CPU-16. It should be set securely in the socket.

Make sure that exchange and stations are properly connected.

* Turn power on.

* AC indicator lamp on the DSM-16 should go on. If not, electricity is not

on. Turn off power and check the connections and fuses.

* Handle plug-in units with care; plug-in units incorporate CMOS. After the

exchange is turned on, do not attempt to disconnect the plug-in units.

4.2 Function

Selection

Select door remote or power remote, as shown in the following diagram,

using the program switch on the CPU-16.

CPU-16 P.C.B.

Program Switch

25

Advertising