Telepresence t3, Room installation guide the wooden panels, Tandberg – TANDBERG Telepresence T3 User Manual

Page 12

Advertising
background image

PAGE 12/22

119077.01 TELEPRESENCE T3 ROOM INSTALLATION GUIDE 12.08

TANDBERG

Telepresence T3

6.

The profiles shall fit as shown to the left.
Should you need to adjust the length of any of the panels, it is important to
use the right tools.

Note!

Be sure to cut the panels with the

backside up, in order to minimize

the risk of damaging the front of the panels. Observe how dimensions are
presented (page 6 of this document)

7.

The profile D is to be used at the top of the topmost panel. Fasten with
screws to the top lattice.

The top panel with profile D as seen from the back is shown to the left.

8.

Insert black aluminum trim pieces vertically between adjacent panels.
These are not precut and must be cut to fit from aluminum stock.

ROOM INSTALLATION GUIDE

ThE WOODEN PANELS

How the profiles should fit.

The top panel with profile D as seen from
the back

Back of Wood Panel upwards

Saw for Gypsum
with guide rail

Integrated dust extraction

Aluminum Profile

Saw for Gypsum
with guide rail

Integrated dust extraction

Advertising