Telepresence t3, Room installation guide the wooden panels, Tandberg – TANDBERG Telepresence T3 User Manual

Page 9

Advertising
background image

PAGE 9/22

119077.01 TELEPRESENCE T3 ROOM INSTALLATION GUIDE 12.08

TANDBERG

Telepresence T3

Note!

These items are included in the Immersive Room Package.

What to unpack: Unpack the three boxes marked

Walnut wall panels T3

Walnut wall panel corners T3

Walnut wall panel Profiles T3

box contents:

The box marked

Walnut wall panels t3 contains aluminum baseboards

(not shown), in addition to the items shown to the upper left.

The box marked

Walnut wall panels corners t3 contains corner base-

boards (not shown), in addition shown to the lower left.

The box marked

Walnut wall panels Profiles t3 contains border lists, in

addition to the following five kinds of profiles:

Note!

It is of utmost importance that you mount the corners first.

Do as follows:

1.

Start at the bottom and build your way up.

2.

Fasten the profile E vertically on the lattice next to the glass walls (it will be
the border between the wooden panels and the glass walls).

3.

Continue by cutting the profile B in appropriate lengths (from the edge of
the corner profile to the radius).

ROOM INSTALLATION GUIDE

ThE WOODEN PANELS

These elements are located in the box
marked

Walnut wall panels t3.

These elements are located in the box
marked

Walnut wall panel corners t3.

24Ч

16Ч

16Ч

Advertising