Planning and initial steps, Telepresence t3, Room installation guide planning and initial steps – TANDBERG Telepresence T3 User Manual

Page 2: Tandberg

Advertising
background image

PAGE 2/22

119077.01 TELEPRESENCE T3 ROOM INSTALLATION GUIDE 12.08

TANDBERG

Telepresence T3

ROOM INSTALLATION GUIDE

PLANNING AND INITIAL STEPS

We strongly recommend that you start your planning with a meeting. Make sure
you include all the people needed:

Project manager and assistant(s)

Carpenters, painters, electricians, mechanical engineer

HVAC (heating, ventilation, air conditioning) specialists

IT personnel

Architect

It is of vital importance that all parties agree on who is going to do what and when,
before you start the installing the system.

ChECklist bEforE tANDbErG iNstAllAtioN

room sizE

Room Dimensions

without second row

Room Dimensions

with second row

depth

width

depth

width

height

Minimum

410 cm
14’ 5

1

2

675 cm
22’ 2”

438 cm
14’ 4

1

2

675 cm
22’ 2”

211 cm
6’11”

Optimal /
Maximum

466 cm
15’ 3

1

2

720 cm
23’ 7”

508 cm
16’ 8”

720 cm
23’ 7”

245 cm
8’

width

dep

th

he

igh

t

Door oPENiNG AND PlACEmENt

tip!

More on room size can be found in the

document

tANDbErG telepresence t3

room requirements.

right:

Defining the terms

depth, width

and

height. Note that room dimensions

refer to an empty room

before T3 specific

walls and ceiling have been mounted.

Included in the TANDBERG Immersive

Room Package:

Glass wall accessories T3

Glass walls T3

LED lights T3

Walnut wall panels T3

Walnut wall panel corners T3

Walnut wall panel profiles T3

Main lighting T3

Not included in the TANDBERG

Immersive Room Package:

Wall lattice construction materials

Entrance door

Rockwool or similar insulation material

Special tools required:

Saw for gypsum with integrated dust
extration

Suggested Workflow
Preparing your room:

Electricity

2 days

HVAC

3 days

Walls w / wooden structure 1 week

Ceiling

1 day

TANDBERG Immersive Room:

Glass panels

1 day

Wood panels

2–3 days

Carpet

1 day

Lighting

2 days

Advertising