For specific wiring information, see the installation instructions.
All wiring except power wires is low voltage.
All customer supplied wiring to be copper and must conform to NEC or CEC and local electrical codes. Wiring shown dotted is to be furnished and installed by the customer.

Zone Sensors —Typical Number Of Wires

A— Manual Changeover ....................................... 6

Manual/Auto Changeover ............................... 7
Manual/Auto Changeover with

Status Indication LED’s ........................... 10

Programmable Night Setback with

Status Indication LED’s ............................. 7

B— 3 Power Wires + 1 Ground Wire (three phase)

2 Power Wires + 1 Ground Wire (single phase)