Pre-Start-up Checklist
Before energizing the unit, the following system devices must be checked:

____ Is the high voltage power supply correct and in accordance with the nameplate ratings?

____ Is the field wiring and circuit protection the correct size?

____ Is the low voltage control circuit wiring correct per the unit wiring diagram?

____ Is the piping system clean/complete and correct?

____ Is unit serviceable? (See clearance specifications on page 7).

____ Are all the unit access panels secure and in place?

____ Is the water flow established and circulating through all the units?

____ Is the condensate line properly sized, run, trapped and pitched?

____ Does the indoor blower turn freely without rubbing?

____ Has all work been done in accordance with applicable local and national codes?

____ Has heat transfer fluid been added in the proper mix to prevent freezing if required?