Step 2: cabinet preparation – Thermador P24WK User Manual

Page 7

Advertising
background image

Step 2: Cabinet Preparation

As defined in the "National Fuel Gas Code"

(ANSI Z223.1, Latest Edition).

0" Bottom

18" Min

.

0" Sides

Counter

Sunk

Screws

FIG. 2
Installing
Side Supports
(both sides)

B

B

D

23-7/16"

See Detail A

FIG. 3 Wall Installation with
Countertop Backsplash

D

See Detail A

FIG. 4 Island Installation
(No Countertop Backsplash)

48" COOKTOP

36" Min. to

Combustible

Material

from Cooking

Surface.

FIG. 1

Clearance

Requirements

V

V

Cooking

Surface

VENT HOOD

13" Max.

depth of

overhead

cabinets

Combustible

Material

V

V

7-13/16"

Detail A

(Front face of cabinet)

Horizontal

Min. Clearance

to Rear Wall:

0" with Backguard

12" w/o Backguard

30" or 36" for 24" Wok

30" or 36" for 30" Cooktop

36" or 42" for 36" Cooktop
48" or 60" for 48" Cooktop

³

³

CORNER NOTCH

DETAIL

2x4 Corner

Support

B

C

22-11/16"

5

­

­

"A"

Vent Hood
Clearance Requirements

Island – 42" or 48" for 24" Wok

Island – 42" or 48" for 36" Cooktop

Island – 48", 54" or 60" for 48" Cooktop

V

30" Min. to 36" Max.,

bottom of Overhead

Hood to Cooking Surface

(36" if hood

contains combustible

materials ).

3/4" Min.

3" min.

both sides

A

B

C

D

24" WOK

47-7/8"

13/16"

46-1/4"

35-7/8"

3/8"

35-1/8"

36" COOKTOP

48" COOKTOP

0" (Control Panel Projecting 2" from Base Cabinet Face)

5/8" (Notch Required for Standard 24"-Deep Base Cabinet, Control Panel Projecting 1-3/8" from Base Cabinet Face)

2" (Control Panel Flush to Cabinet Face – Min. 25-3/8"-Deep Base Cabinet Required)

30" COOKTOP

29-7/8"

3/8"

29-1/8"

24-3/4"

3/8"

24"

Advertising