Mfg No. 164771, Page 9

Collar for combustion

air pipe.

Vent Pipe - when a taper-type reducer

is required in the vent pipe; it must be no

more than 6” (152mm) from the box.

Seal the seam in

the vent pipe.

Concentric

Adapter Box

Combustion

air pipe

Field-supplied

mounting brackets

Install seal

in vent pipe

opening

Install the vent pipe

by inserting it into the

terminal side of the

box and pushing it out

through the seal on the

heater side.

NOTE: Be sure flow

direction is correct.

Vent Flow

Combustion

Air

Flow

22"

(559mm)

minimum

Snow

Clearance

6C

1)Slide combustion

air inlet over the

vent pipe

Install field-supplied
flashing at roof
opening (flashing not
illustrated).

cause the pipe diameter does not change); plus bracket length;
plus the width of the roof; plus the length of the outer inlet air
pipe; plus a minimum of 22" (559mm).
Lubricate the seal and pipe with liquid soap or a rubber lubri-
cant. (Installation Tip: Spray cooking oil works well as a lubri-
cant for this task.) Being sure the pipe is in the proper flow
direction, slide the end through the box and push it out through
the rubber seal
. Push evenly using caution not to displace the
seal from its position on the edge of the hole. If the rubber seal
moves, slide the pipe back slightly, re-position the seal, and
slide the pipe through again.
Position the vent pipe so that it will extend a minimum of 22"
(559mm) past the end of the combustion air pipe. See Figure
6B.
A maximum of 6" (152mm) of vent pipe should extend out the
heater side. Any time the pipe is re-positioned, re-check the
seal to be sure that it has not rolled. Adjust the pipe and seal
until the pipe is the correct length on each side of the box and
the seal is over the edge of the hole and tight to the entire
circumference of the pipe.

"Through-the-Roof" View of a typical installation
of a vertical vent/inlet air terminal and concentric
adapter (Option CC2)

Flue

Exhaust

(Vent )

Pipe

Vent

Termina

l

Combustion

Air Inlet

Seal with high

temperature silicone

rubber sealant supplied

with the kit.

Flashing

(field supplied)

Roof

Vent

Pipe

Combustion Air Pipe

Concentric

Adapter

9-3/8”

(238mm)

12” (305mm)

6 ft (1829mm)

minimum

11” (279mm)

18”(457mm)

minimum

Wall or

Adjoining

Building

Flashing

(field supplied)

Roof

Concentric

Adapter

Thimble

5 ft (1524mm)

maximum (Size

according to

anticipated

snow depth.

Side View

"X" is the length of combustion air
pipe required through and above
the roof
"X" must equal roof thickness
plus
clearance required for
anticipated snow
plus ridge and/or
parapet clearance
"X" must not
exceed 60"
(1524mm)

6A

6B

2c) Attach the outside portion of the com-

bustion air pipe to the box. Determine
the length of the combustion air pipe so
that dimension "X" (Figure 6A) is equal
to the roof thickness, plus snow depth
and ridge or parapet clearance, but does
not exceed 60" (1524 mm). Attach the
combustion air pipe to the collar with
sheetmetal screws being careful not to
penetrate the vent pipe.

3. Attach the concentric adapter. Insert
the vent pipe and combustion air pipe up
through the roof and secure the adapter box.
Flash the combustion air pipe to the outside
of the roof as required.
4. Slide the combustion air inlet over the

vent pipe and fasten the collar
to the end of the combustion air
pipe with sheet metal screws
(See Figure 6C). Seal joint at top
between vent pipe and combus-
tion air inlet with silicone seal-
ant to prevent water leakage.
5. Attach the exhaust termi-
nal
with sheet metal screws (See
Figure 6D).
6. Vertical vent terminal/combus-
tion air inlet is installed and ready
for connection to the heater.
7. Connect Concentric Adapter

Box to the Heater - Use the pipe speci-
fied and joints required for type of pipe.
If collars at the heater or adapter are dif-
ferent diameters from the pipe (use only
diameters allowed on page 6), make con-
nection with field-supplied taper-type re-
ducer or enlarger.
A minimum of 12" (305 mm) of
straight pipe is required at the venter
outlet.
Due to the high temperature, do
not enclose the vent pipe or place pipe
closer than 6" (152 mm) to combustible
material.

Installation of the vertical vent and combustion air system on your sepa-
rated-combustion unit is complete. Refer to Figure 6E and verify that all
installation requirements are met.

Exhaust
Terminal

6D

12" (305mm)

minimum

Combustion
Air Inlet

2)Fasten to the end

of the combus-

tion air pipe

3)Seal the top joint

with silicone

Figure 6E - Installation of Separated-Combustion Unit with Vertical Vent and Combustion Air Pipes (Option CC2)

Rear
View

Advertising
This manual is related to the following products: