6. Position the valve over the valve mounting threaded

studs and connect both ends of the hose to the drain

box and steam generator.

7. Position the spring clamps about 3 mm (1/8") from

the end of the hose.

8. Install and tighten valve mounting 10-32 cap nuts.

9. Plug valve electrical leads into the wiring harness.

To Test:

Operate steamer and allow steam generator to fill. Check

for leaks and observe if drain valve fully closes. Turn off

steamer and observe that drain valve opens and the

steam generator drains. Install back cover.

10.6

Water Inlet Valve - Three Way

P/N 090827

1. Turn off power to the steamer. Turn off the water

supply to the steamer. Remove the water supply

hose connection on the rear of the steamer.

2. As viewed from the rear, remove the back panel and

the right panel.

3. The water inlet of the valve branches to three

individual solenoid activated valves within a single

housing, with the following sets of wires:

Solenoid

Wires

Top Steam Generator Fill: Green and Blue

Bottom Steam Generator Fill: Violet and Gray

Condensate Spray:

Black and White

4. Slide the hose clamps down the hose until needed

for reassembly. Loosen and remove the hoses using

a gentle rocking motion.

5. From the back of the steamer, remove the two

screws holding the valve assembly in place. Then

lower the valve WITH THE WIRES STILL

ATTACHED.

6. From the back of the steamer, remove the two 8-32

screws holding the valve assembly in place. Lower

the valve.

7. Carefully unplug the connectors, one at a time and

attach to the new valve.

8. To install a new valve, reverse the procedures and

first install the six wires (three sets) as listed in Item 3

of this Section. Fasten the valve to the steamer with

the two screws. Make sure that the valve is NOT

installed upside down.

9. Re-attach the hoses to the valve. Slide the hoses all

the way so that the end of the hose is flush against

the face of the valve.

IMPORTANT. Make sure that the correct steam

generator hose is connected to the corresponding valve

outlet. Slide the hose clamps back into position around

the end of the hose and tighten the clamps.

Slide the hose clamps so that they are within 3 mm (1/8

inch) from the end of the hose.

TOP hose — to the TOP Steam Generator

MIDDLE hose — to the BOTTOM Steam Generator

BOTTOM hose — to the DRAIN Box

11. Attach the three sets of wires to the valve making

sure that the proper wires are connected to the

corresponding terminals.

To Test:

With power ON, turn on the power switch to one cavity.

The fill solenoid for that steam generator should energize

allowing water to enter the steam generator. When

READY light is ON, spray valve solenoid should energize

and water should enter the drain box.

10.7 Water Inlet Valve Coil

If a solenoid coil on the water inlet valve is defective,

replace the entire valve in accordance with Section 10.6.

10.8 Drain Box Spray Nozzle

P/N 081670

1. Raise the stainless steel vent pipe to remove it from

the drain box. Do not loosen the hose clamp around

the vent pipe. The hose clamp serves to prevent the

pipe from going too far into the drain box. Secure the

vent pipe in the raised position.

2. Lift the cover of the drain box. There are no fasteners

holding the cover on the drain box.

3. Tip the cover and note there is a circular hole in the

middle and the spray nozzle (with a hex head) is in

the center of the hole.

4. With a socket wrench, turn the spray nozzle in the

counter-clockwise direction to remove.

5. To install new nozzle, place pipe compound on the

nozzle threads, insert nozzle in socket wrench and

start the nozzle in the hole. Tighten nozzle.