10.18

Fan

P/N 096790

IMPORTANT: Make sure that the fan has come to a

complete stop before attempting any work on the fan.

1. To remove the fan from either the top or bottom

cavity, open the door and remove the pan support

wire rack in front of the fan.

2. With an allen wrench, loosen the set screw which

holds the fan to the motor shaft.

3. Hold onto the fan, and with a slight rocking motion

pull the fan off the motor shaft.

To Install:

4. Note that the motor shaft has a flat surface. Position

the fan hub on the motor shaft so that the allen set

screw is opposite the flat portion of the motor shaft.

5. Slide the fan onto the motor shaft far enough so that

the motor shaft is at the end of the fan hub.

6. With an allen wrench, tighten the set screw on the

fan.

NOTICE: Advise customer to periodically clean the fan

blades of deposited food grade grease coming from the

foods being cooked. The deposit of such grease over

time could cause the fan to vibrate.

10.19

Fan Motor Assembly

Motor Insulation

P/N 096740

P/N 094135

Motor Shaft Seal

Oil Slinger Washer

P/N 096868

P/N 096831

1. Shut off electrical power to the steamer.

2. From inside the cavity, remove fan using an allen

wrench as indicated in Section 10.17.

3. Using a socket wrench, remove the four 1/4-20 Keps

nuts holding the motor. Note that one of the nuts

secures the motor ground strap to the steamer.

To Install a New Motor:

4. Make sure the motor insulation board is installed on

the four threaded studs to the cavity wall.

5. Apply lubricant on both sides of the steamer motor

seal and the inside hole. Refer to the Motor

Assembly Chart.

6. Insert the steamer motor seal in the cutout of the

insulator board.

7. To prepare motor for mounting, slide the oil slinger

washer onto the shaft about ½" (12 mm) down the

shaft.

IMPORTANT: This washer has two surfaces: A

rubber surface and a phenolic surface. Make sure

the phenolic surface is facing the motor.

8. Install the plate seal holder onto the motor shaft.

Carefully slide the plate seal holder down the motor

shaft until it engages the slinger washer. Continue

moving the plate seal holder down the motor shaft

until the plate comes to rest on the raised bosses of

the motor casting.

9. Using this technique, the rubber side of the oil

Slinger washer should be in contact with the plate

holder and

there should be a space of

approximately 5/64" (2 mm) between the

phenolic face of the washer and the motor.

10. Using four hex/slotted 6-32 screws, screw the motor

mounting plate to the motor with each screw passing

through corresponding holes in the plate seal holder.

11. The entire assembly may now be positioned on the

four threaded studs protruding from the cavity wall.

Fasten the assembly with nuts using a wrench. Make

sure that the green/yellow ground strap is secured

under one of the nuts securing the motor. The upper

motor has a drip shield installed on the lower studs.

10.20

Motor Starting Capacitor

P/N 096813

1. Turn off electrical power to the steamer.

2. Loosen and remove the screw holding the capacitor.

3. Unplug the two terminal wires from the capacitor.

Remove the capacitor.

To Install New Capacitor:

NOTICE: Make sure that the correct capacitor is

used, which is 3 mfd at 330 volt.

4. Make sure the capacitor is seated properly, then

tighten the screw securing the capacitor to the

mounting plate.

5. Plug terminal wires to the capacitor.

10.21

Steam Generator Ready Thermostat

P/N 088865

This thermostat is attached to the cavity steam port.