Om/sm-hy-6g(ce) – Unified Brands HYPERSTEAM HY-6G(CE) User Manual

Page 30

Advertising
background image

0 OM/SM-HY-6G(CE)

OM/SM-HY-6G(CE)

30

1. Turn off power to the steamer.

2. Unplug the two wires from the thermostat.

3. Using a wrench, remove the thermostat.

4. To install a new thermostat, use a small amount of

heat sink compound (1 drop), applied to bottom of

thermostat. Seat the thermostat on the steam port

and connect.

5. Plug the thermostat into the wiring harness.

10.22

Steam Port

Gasket

P/N 096736

P/N 099250

1. Shut off power to the steamer.

2. Remove the 1-1/8 inch steam hose by loosening the

clamp around the hose and sliding it away from the

steam port. Turn and pull to loosen hose and remove

from steam port.

3. With a wrench, remove the screws holding the

thermostat to the steam port.

4. Cut and fold up aluminum foil insulation blanket to

expose the two nuts which hold the steam port to the

cavity wall threaded studs.

5. With a wrench, remove the two nuts.

6. Remove the steam port.

To Install:

7. Put a small bead of silicone sealant in and around

the groove in the steam port to seal any possible

leaks, or use gasket P/N 099250.

8. Install steam port on threaded studs. Secure with two

nuts.

9. Fold down aluminum foil insulation blanket to original

blanket position and repair cuts with aluminum foil

duct tape.

10. Reinstall thermostat as described in 10.20 above.

11. Reinstall steam hose to steam port and install the

clamp.

10.23

Cavity Steam Hose Assemblies

P/N 099953 (Top)

P/N 088880 (Bottom)

There are two hoses which connect the steam

generators with their respective cavities. One for the top

cavity and one for the bottom cavity. If both hoses are to

be replaced, replace them one at a time.

1. Shut off power to the steamer.

2. Remove cavity side and lower side panels of table.

3. In the upper portion of the steamer, remove hose.

Turn and pull the hose to remove it from the hose

nipple.

4. In the lower section of the steamer, remove the hose

clamp from where the hose is connected to the

steam generator. Turn and pull the hose to remove it

from the hose nipple.

5. The hose may be removed. Be careful that the hose

clamps do not fall off and get lost.

IMPORTANT: Make sure that the correct part (and

part number) are being used. The two hoses in the

steamer are of different lengths. (See Page 21 for

Part Numbers.)

To Install:

6. Slide the two hose clamps onto the hose and

position the hose adjacent to the steam port and

steam generator.

7. Slide the hose onto the hose nipple on the steam

port and at the other end, onto the steam generator

nipple. Make sure the hose is on all the way so that

the end of the hose is against the face of the nipples.

8. Install the hose clamps 3 mm (1/8") from the end of

the hose.

10.24

Door Removal/Installation/Alignment

P/N 094150

1. To remove the door, turn off the steamer power and

allow the steamer to cool. Then, remove door by

supporting the weight of the door and remove hinge

pin.

2. Place the door on a flat, clean table or similar

support, with gasket facing up. Be careful not to

scratch door surface.

3. Inspect door gasket for signs of cuts or other defects

which may impair its function. Replace if necessary.

To Install:

4. To install the door, apply NEVER-SEEZ lubricant to

hinge pin. Align door with hinge and insert hinge pin.

Advertising