User’s manual – U-Line CLRCO2075 User Manual

Page 12

Advertising
background image

NOTE

All U-Line units have a zero
clearance for the door to
open (Figure 4). See BUILT-
IN INSTALLATION for addi-
tional clearance require-
ments.

NOTE

Stainless Steel models
require a minimum of
2-1/2" door handle clear-
ance when installed against
a wall.

6. Install and connect the water supply line. See CONNECTING THE

WATER SUPPLY for installation requirements.

7. Position the unit to allow free air flow through the front grille

(Figure 5).

Figure 5

8. Wipe out inside of unit with a clean, water-dampened cloth.

O

N

O

F

F

C

L

N

CLRCO004

INTAKE

EXHAUST

10

User’s Manual

UL124A

DOOR

SWING

CABINET

OR WALL

0"

CLEARANCE

NEEDED

Figure 4

30005_CLRCO2075 User Manual 8/22/03 4:24 PM Page 10

Advertising