Verifying the installation, Verifying the installation -7 – Univex ProSafe WFS709TP User Manual

Page 27

Advertising
background image

WFS709TP ProSafe Smart Wireless Switch Hardware Installation Guide

Installing the Chassis

2-7

v1.0, May 2007

3. Make sure that the power supply can handle the connected Power over Ethernet (PoE) devices.

4. Attach the power cord to the power input socket at the back of the chassis.

Plug an appropriate power cord into the power input socket. Use the included power cord if it
is compatible with your electrical outlet. Otherwise, replace the power cord with the type
appropriate for your country. The power input socket accepts a power cord with a standard
IEC320 connector.

5. Attach the power cord to a proper electrical outlet to power up the WFS709TP.

Once power is connected, the WFS709TP automatically turns on and you can perform the
power-on test.

Verifying the Installation

After the WFS709TP ProSafe Smart Wireless Switch is installed and connected to power, verify
the following:

1. Check that the Power LED lights solid green immediately upon power up and remains solid

green during and after boot.

Note: The total power drawn by all connected PoE devices must not exceed 100

Watts. For power ratings for NETGEAR APs, refer to the access point
installation guide.

Warning: For proper safety and performance, the power cord must be rated to 10 A

and conform to grounded electrical standards in the country where the
product is operated.

Warning: For safety reasons, make sure the power outlet and plug are within easy

reach of the operator and can be quickly disconnected if necessary.

Note: The Status LED remains off until you perform the initial setup.

Advertising