Insert HXT-bars through cleanout openings as shown below (omit the bottom, blue-tipped, HXT-bar in the opening

&IGURE

between the front section and the first intermediate section)

Complete block assembly

Install burner mounting plate on front
section

Install four ½" x 3½" studs to secure burner mounting plate to

1.

section:

Thread and lock together two nuts on rounded end of stud.

a.

Thread flat end of stud into one of four holes located around
opening.
Remove nuts.

b.

Repeat steps a and b for remaining studs.

c.
Install burner mounting plate:

2.

Apply

a.

1

/

8

" continuous bead of sealing rope adhesive in groove

around opening in section.
Position ½" sealing rope in groove. Overlap ends at least one

b.

inch.
Install burner mounting plate with part number and the word,

c.

"

50

" positioned at top. Use ½" washers and nuts.

Install observation port assemblies on front
and back sections

Install front observation port assembly:

1.

Apply

a.

1

/

8

" continuous bead of sealing rope adhesive in groove

on observation port.

Position

b.

3

/

8

" sealing rope in groove.

Secure assembly to section. Use 10-32 x ¾"

c.

truss-head screws.

Repeat above steps for back observation port as-

2.

sembly.

Insert HXT-bars

See

1.

Figure 12, page 12.

Flue HXT-bars are identified by painted ends. They

2.

must be inserted as shown, with the HXT-bars in
the sequence:

4OP

s

position

RED

s

-tipped, HXT-bar 24 inches long —

place on the top row of pins.

-IDDLE

s

position

WHITE

s

-tipped HXT-bar, 26 inches long —

place on the first row of pins below the top
clean-out plate boss.

"OTTOM

s

position

BLUE

s

-tipped HXT-bar, 34 inches long —

place on the first row of pins below the
bottom cleanout plate boss.