Complete block assembly – Weil-McLain 88 User Manual

Page 13

Advertising
background image

"OILER

13

Part No. 550-100-068/1009

Cleanout plate assembly

&IGURE

Complete block assembly

(continued)

The boiler contains ceramic fiber and

fiberglass materials. Use care when han-
dling these materials per instructions on
page 34 of this manual. Failure to comply
could result in severe personal injury.

DO NOT insert a bottom HXT-bar into the opening

between the FRONT section and the first intermediate
section.

To remove flue HXT-bars when required to clean the boiler

3.

flueways, grab the end of each HXT-bar with pliers and pull
straight out. Clean HXT-bars and replace as shown in Fig-
ure 12, page 12.

Install cleanout plates

Cleanout plates must be installed gas-tight to prevent

possibility of flue gas leakage and carbon monox-
ide emissions, resulting in severe personal injury or
death.

See

1. Figure

13.

Position two ¼" x 1¾" carriage bolts in cleanout opening, be-

2.

tween the cleanout plate bosses, as shown. Secure with washers
and nuts.
Place woven fiberglass gasket over carriage bolts.

3.

Mount cleanout plate over opening. Secure with nuts and wash-

4.

ers.
Repeat steps 1 through 3 for remaining cleanout plates.

5.

Install draft hood collar

Install

1.

1

/

8

" continuous bead of sealing rope adhesive in groove on

draft hood collar.
Position ½" sealing rope in groove. Overlap ends of rope at least

2.

1 inch.
Mount collar over flueway outlet on back section. Secure with ½

3.

x 1½" hex head cap screws and washers.

Advertising