Installation – mounting the range hood – Zephyr AK7548ASX User Manual

Page 12

Advertising
background image

10

www.zephyronline.com

C/L

C/L

A

B

12

3/8

min
26”

4”

wood board

fig. 2

fig. 1

C

D

E

fig. 2 - C

fig. 2 - E

fig. 2 - D

NUT

SCREW

Installation –

Mounting the Range Hood

1. Measure distance from range top to hood bottom (26” min) Level

and mark line A.

2. Plum and mark center line.
3. Mark mounting height line B. (12 3/8” from line A)

(This is the top of the board used to hang the hood)

4. Mark center line of wood board and align top of board with line B.

Secure wood board to studs using (4) M4 wood screws. Wood Board
Dimensions
: (W x D x H)

AK7500ASX - 28” x 3/4” x 4”

AK7536ASX - 34” x 3/4” x 4”

AK7548ASX - 46” x 3/4” x 4”

5. If horizontally ducting hood refer to hood specifi cations on page 8 for

cut-out dimensions.

6. *Hang hood on wood board and secure using (4) M4 x 16 screws.
7. Install blower(s). Turn to page 11 for blower installation

instructions.

8. Install electrical.
9. Install duct work and duct tape.
10. Power up hood and check for leaks around duct tape.
11. Install optional accessories: duct cover (fi g. 2-C), back splash (fi g. 2-

D), and/or heat lamp kit (fi g. 2-E). (sold separately) For more detailed
instructions refer to manual included with each accessory.

12. Reinstall baffl e fi lters.

NOTE: If installing a back splash do not install screws at bottom of
hood yet. There is a lip on the back splash that needs to be inserted
behind the hood fi rst.

CAUTION: At least two installers are

required due to the weight and size of the
hood.

!

Advertising
This manual is related to the following products: