Zephyr AK7548ASX User Manual

Page 13

Advertising
background image

11

PBI-1100A INTERNAL BLOWER COMPATIBLE WITH 10” ROUND VERTICAL DUCTING ONLY

Please turn to page 12 for instructions on installing CBI-xxxB in horizontal ducting mode.

1. Position blower plate over bracket on inside

back of hood and pivot up. Secure plate to hood
with (2) 10x3/16” screws. (blower pictured is a
PBI-1100A)

2. Connect male end of blower wire to female plug

in the hood. (plug is located inside the hood
behind the control panel)

3. CBI-xxxB Blower – Connect 6” round duct work

to blower collar.
PBI-110A Blower – Place 10” round adapter on
top of hood and secure with (4) M4x8 screws.
Connect 10” round duct work to 10” round
adapter.

Installation –

CBI-xxxB and PBI-1

100A

Internal Blowers

Advertising
This manual is related to the following products: