Zephyr AK7548ASX User Manual

Page 15

Advertising
background image

13

Installation –

CBI-xxxB Horizontal Ducting Conversion

6. Attach 6” round to rectangular transition adapter

to hood with (4) M4x8 screws.

7. Attach blower brackets to blower with

(4) 10x3/16” screws. (2) screws for each
bracket.

8. Place blower into round end of 6” round

transition adapter. Attach brackets on blower to
blower plate with (4) 3.5x8 screws. (2) screws
for each bracket.

9. Attach rectangular starting collar to hood using

the (6) screws removed from the rectangular
cap in step 4.

Advertising
This manual is related to the following products: