Installing the lockingbar, Installing the locking bar – 3Com WL-560 User Manual

Page 18

Advertising
background image

12

C

HAPTER

2: I

NSTALLING

THE

B

RIDGE

2 Route the power and Ethernet cables through the large opening in the cradle.

Figure 5 shows a cable being routed under the cradle.

Figure 5 Routing Cable Under the Cradle

3 Connect the power and Ethernet cables to the ports on the Bridge.

4 Snap the Bridge onto the cradle.

Installing the

Locking Bar

For additional security, install the locking bar in the cradle after the Bridge
is mounted to the wall. Use your own lock to secure it in place.

To install the locking bar:

1 Insert the locking bar through the opening in the side of the cradle, as

shown in Figure 6.

Figure 6 Inserting the Locking Bar

.11g

.100

.10

.11a

Advertising