3 mounting steps with screwed connection – VEGA VEGAWELL 72 4 … 20 mA User Manual

Page 14

Advertising
background image

M

ount VEGAWELL 72 with straining clamp as follows:

1

H

ang the straining clamp on a suitable wall hook

2

L

ower VEGAWELL 72 to the requested height

3

S

lide the clamping jaws upward and push the suspension

cable between them

4

H

old the suspension cable, push the clamping jaws

downward and fix them with a light blow

R

emoval is carried out in reverse order.

4

.3 Mounting steps with screwed connection

1

2

3

4

5

6

Fig. 4: Threaded fitting
1

Suspension cable

2

Seal screw

3

Cone bushing

4

Seal cone

5

Threaded fitting

6

Seal

M

ount VEGAWELL 72 with screwed connection as follows:

1

W

eld the welded socket into the vessel top

2

L

ower VEGAWELL 72 to the requested height by means

on the welded socket G1½ A or 1½ NPT on the vessel side

3

I

nsert the suspension cable from below into the open

screwed connection

4

S

lide the seal cone and the cone sleeve over the

suspension cable, fasten manually with the seal screw

14

VEGAWELL

72 • 4 … 20

mA

4 M

ounting

27501

-EN

-080806

Advertising