8 switch on phase – VEGA VEGABAR 64 Foundation Fieldbus User Manual
Page 29
Advertising
5.8 Switch on phase
After VEGABAR 64 is connected to voltage supply or after voltage
recurrence, the instrument carries out a self-check for approx. 30
seconds. The following steps are carried out:
l
Internal check of the electronics
l
Indication of the instrument type, the firmware as well as the
sensor TAGs (sensor designation)
l
Status byte goes briefly to fault value
Then the current measured value will be displayed and the
corresponding digital output signal will be outputted to the cable.
2)
2)
The values correspond to the actual measured level as well as to the set-
tings already carried out, e.g. default setting.
Switch on phase
VEGABAR
64 • Foundation Fieldbus
29
5 Connecting to power supply
28259
-
EN
-081209
Advertising