9 Application examples

VEGAMET 391 • With SIL qualification

38704-EN-130228

triggered after the enquiry period. The enquiry period is started as

described above when the relay is switched on.
Switch on reaction of the pump control 2

When the signal conditioning instrument is switched on, the relays are

at first in a switched-off status. Depending on the input signal and the

switched-on period of the individual relays, the following relay switch-

ing conditions can occur after the start procedure:

Input signal is higher than the upper switching point -> Relay with

the shortest switch on period is switched on

Input signal is between lower and upper switching point -> Relay

remains switched off

Input signal is smaller than the lower switching point -> Relay

remains switched off