I2C

1

1

2

Fig. 12: Wiring plan, double chamber housing
1

Voltage supply/Signal output

5.5 Switch on phase

A

fter connecting VEGABAR 52 to power supply or after a voltage

recurrence, the instrument carries out a self-check for approx. 30
seconds:

l

I

nternal check of the electronics

l

I

ndication of the instrument type, the firmware as well as the

sensor TAGs (sensor designation)

l

O

utput signal jumps briefly (approx. 10 seconds) to the set fault

current

T

hen the corresponding current is outputted to the cable (the value

corresponds to the actual level as well as the settings already carried
out, e.g. factory setting).

Wiring plan

Switch on phase

20

VEGABAR

52 • 4 … 20

mA/HART - climate compensated

5 C

onnecting to power supply