4 Mounting

VEGAPULS 63 • Modbus and Levelmaster protocol

41364-EN-130228

Instructions for orientation:

Note marking of the polarisation plane on the sensor

With threaded fitting, the marking is on the hexagon, with flange

connection between the two flange holes

The pipe connections to the vessel must be in one plane with this

marking

Instructions for the measurement:

The 100 % point must not be above the upper tube connection to

the vessel

The 0 % point must not be below the lower tube connection to the

vessel

Min. distance sensor reference plane to the upper edge upper

tube connection > 300 mm

For the parameter adjustment, select "Application standpipe" and

enter the tube diameter to compensate errors due to running time

shift

A false signal suppression with integrated sensor is recommended

but not mandatory

The measurement through a ball valve with complete run is pos-

sible

Constructional requirements on the bypass pipe:

Material metal, smoother inner tube

In case of an extremely rough tube inner surface, use an inserted

tube (tube in tube) or a radar sensor with tube antenna

Flanges are welded to the tube according to the orientation of the

polarisation level

Gap size with junctions ≤ 0.1 mm, for example, when using a ball

valve or intermediate flanges with single pipe sections

The antenna diameter of the sensor should correspond to the

inner diameter of the tube

Diameter should be constant over the complete length