Distributor pipe control - farm/commercial – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-1793 User Manual

Page 6

Advertising
background image

Page 6 of 8

PNEG-1793

Distributor Pipe Control - Farm/Commercial

8. Assemble the inner mount pipe control bracket (DPC0005) to the pipe control bracket brace

(DPC0021) using the same method as the intermediate guide assembly.

(See Figure 4 on Page 4.)

Attach the eight (8) hole index plate (DPC0010) to the outer pipe guide bracket (DPC0018)
using 3/8" x 3/4" bolt (S-7105), 3/8" flat washer (S-248) and 3/8" flange nut (S-10028).

9. Assemble the clamp band as shown by fastening the clamp rod weldment (DSP16003) to the clamp

band (DSP16002) using 1/2" flange nuts (S-8506) onto the rod ends. Attach the index plate mount
angle (DPC0009) to the front of the clamp bands (DSP16002) with 3/8" x 1" bolts (S-7469),
3/8" flat washers (S-248) and 3/8" flange nuts (S-10028).

10. Attach the control lever assembly to the trunking using two (2) 3/8" x 1" bolts (S-7469),

3/8" flat washers (S-248) and 3/8" flange nuts (S-10028) and secure to the guide using
1/4" x 3/4" x 3" U-bolt (S-10145) and four (4) 1/4" flange nuts (S-7215).

(See Figure 6.)

Figure 6 Control Lever Assembly to Trunking

Advertising