Distributor pipe control - farm/commercial – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-1793 User Manual

Page 7

Advertising
background image

PNEG-1793

Page 7 of 8

Distributor Pipe Control - Farm/Commercial

11. Cut last section of piping to desired length and drill hole for 5/16" roll pin. Guide the last section of

control pipe through the index plate (DPC0010).

12. Attach the pipe control lever assembly (DPC0015) to the bottom of the pipe using a 5/16" x 1-3/4"

roll pin (S-8397).

13. Remove guard (DPC0022) from the control handle assembly. Guide cable through end of control

handle (DPC0016). Pull cable down with enough tension to keep cable taught, but not enough
to pull down on the distributor index assembly. Secure cable with cable clamp (not supplied).
Replace guard (DPC0022).

(See Figure 7.)

Figure 7 Bottom Cable

Cable

Cable clamp

5/16"-18 x 1-1/2"
Shoulder bolt
(S-10144)

Guard (DPC0022)

Pull

5/16" Flange
nut (S-3611)

Control handle
(DPC0016)

1/4" x 1-3/4" x 3"
U-Bolt (S-10145)

5/16" x 1-3/4"
Spring pin (S-8397)

Advertising