Distributor pipe control - farm/commercial – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-1793 User Manual

Page 8

Advertising
background image

Page 8 of 8

PNEG-1793

Distributor Pipe Control - Farm/Commercial

14. Install the position indicator (DPC0017) to the pipe using the U-bolt (S-10145) and 1/4" flange

nuts (S-7215).

(See Figure 8.)

Figure 8 Pipe Control Lever and Position Indicator

15. Apply the provided numbered decals as desired to denote the distributor spout position.

Advertising