GE Industrial Solutions Entellisys System Test Kit User Manual

Page 30

Advertising
background image

Test Menu

31

How trip time curve generated
For Overcurrent Protection test, three LT Points, three ST points, and two IOC Points are tested
for generating the Automatic Trip time curve. Overcurrent test points are considered as
multiples of LT pickup.

For Ground Fault Protection test, four points are tested when GFI2T curve is enabled and two
points when disabled. Ground Fault test points are considered in multiples of GF pickup.

The setup required for Overcurrent Protection tests is based on Protection bits enabled.

Breaker Trip

Specifies whether the test will physically trip the circuit breaker.

;

– Circuit Breaker will Trip

†

– Circuit Breaker will not Trip

Ground Fault

Allows users to temporarily Defeat Ground Fault during the test, or to
Resume/Run Ground Fault as normal during the test. Ground Fault must
be defeated for single phase tests—otherwise a trip on Ground Fault will
occur.

;

– GF will Resume/Run as Normal.

†

– GF will be temporarily defeated during the test period.

Note: After the test has concluded, Ground Fault will resume
automatically.

This feature is enabled only when Ground Fault is enabled in the selected
circuit breaker.

Breaker Setting Table/Tabs

Displays the actual settings for the circuit breaker selected. This is for
information only.

Select Curve Type

Select one of two types of curves to generate—either “Overcurrent Trip
Time Curve” or “Ground Fault Trip Time Curve”. Operator selectable.

Fault Phase

The phase(s) for fault injection. Operator selectable.

Options for LT, ST, IOC Test Selection: Phase A, Phase B, Phase C, Phase A &
B, Phase B & C, Phase C & A, Phase A, B & C

Option for GF Test Selection: Phase A, Phase B, Phase C, and Neutral

Automatic Trip Time Settings

This table displays the amount of test kit voltages that will be injected with
respect to the calculated trip time curve.

Table 1-8 Test setup field description

Advertising