Installing the trip unit, Trip unit attached to its mounting plate, Harness connector attached to the trip unit – GE Industrial Solutions ProTrip Conversion Kits AK-1-15 and AK-1-25 User Manual

Page 10: Trip unit mounted on the breaker

Advertising
background image

Installing the Trip Unit

1. Place a lock washer and flat washer over each of

the three

1

/

4

-20 x 1

3

/

8

" screws provided and insert

through the mounting holes on the trip unit

mounting plate. From the rear of the plate, place

a flat washer, spacer, and O-ring over the screws,

as shown in Figure 12.

2. Remove the large screw from the rear of the trip

unit. Place the trip unit in position on the mount-

ing plate, with the 50-pin connector aligned with

the opening in the plate. Secure with the large

screw, as shown in Figure 12.

3. Insert the 50-pin female connector on the wiring

harness into the trip unit connector through the

rear of the mounting plate. Secure to the mount-

ing plate with the two small screws provided, as

shown in Figure 13.

4. Place the trip unit and mounting plate in position

on the support bracket mounted to the breaker.

Secure with the screws in the mounting plate into

the tapped holes in the bracket, as shown in

Figure 14.

Figure 12. Trip unit attached to its mounting plate.

Figure 13. Harness connector attached to the trip unit.

Figure 14. Trip unit mounted on the breaker.

11

Advertising