Connection, Assembly torque – GE Industrial Solutions ProTrip Conversion Kits AK-1-15 and AK-1-25 User Manual

Page 7

Advertising
background image

6. Insert the

3

/

8

-16 x 2

1

/

4

" bolt, lock washer, and flat

washer provided through the top copper bus into

the contact arm, as shown in Figure 7.

7. Tighten the

5

/

16

-18 bolts CT bolts, placed in step

5, to 100 in-lb, as shown in Figure 8.

8. Tighten the two

3

/

8

-16 bolts inserted in steps 2

and 6 to 200 in-lb.

WARNING:

Steps 7 and 8 provide critical electrical

integrity connections. The designated bolts must be
correctly tightened for proper operation. Failure to
tighten these bolts properly will cause a breaker
failure, resulting in property damage and/or
personal injury.

Figure 7. Top bus connection.

Figure 8. CT assembly torque.