Installing the flux shifter assembly, Trip unit support bracket installed – GE Industrial Solutions ProTrip Conversion Kits AK-1-15 and AK-1-25 User Manual

Page 9

Advertising
background image

Installing the Flux Shifter Assembly

1. Remove the two

1

/

4

-20 nuts or bolts and washers

on the right side of the mechanism that hold the

mechanism together. The flux shifter will be held

in place with the existing studs or bolts.

2. Install the flux shifter assembly onto the existing

studs as shown in Figure 10. Use the

1

/

4

-20 nuts

or bolt and lock washer to secure the top of the

bracket to the side of the handle mechanism and

the lock washer and special fastener to secure the

bottom.

NOTE:

Figure 10 shows the handle removed for

clarity. It is not necessary to remove the handle
during installation.

10

3. Place the two

1

/

2

" spacers over the studs on the

flux shifter mounting plate, as shown in Figure

10. Place the two mounting holes in the trip unit

support bracket over the studs on the top of the

flux shifter bracket, as shown in Figure 11. Secure

with the

1

/

4

-20 nuts, flat washers, and lock

washers provided.

NOTE:

The right-corner enclosure bolt may have to

be shortened if it interferes with the bracket or the
trip unit.

Figure 10. Installing the flux shifter assembly.

Trip Unit

Support

Bracket

Figure 11. Trip unit support bracket installed.

Advertising