SECTION 4. INSTALLING THE
CONVERSION KIT

Installing the Current Sensors (CTs)

1. Place the bottom copper bus in the breaker frame

and insert the

1

/

4

-20 x

7

/

8

" screw with a flat and

lock washer, as shown in Figure 5.

2. Insert the

3

/

8

-20 x 1

1

/

4

" bolt with a flat and lock

washer through the electrical contact hole in the

top of the bus, as shown in Figure 5.

3. Remove the

1

/

4

-20 Philips-head screw from the

back of the breaker above the load terminal that

aligns with the hole in the copper bus. On AK-1-

15 breakers, it is the right screw; on AK-1-25

breakers, it is the left screw. Replace the screw

with the

1

/

4

-20 x 1

5

/

8

" screw provided.

4. Use the

1

/

4

-20 nut, flat washer, and lock washer

on the screw inserted in step 3 to fasten the bus,

as shown in Figure 5.

5. Place the CT, insulating barrier, and top copper

bus over the copper CT post. Secure the bus with

the

5

/

16

-18 x 1" bolt, flat washer, and lock washer

provided, as shown in Figure 6.

Figure 5. Bottom bus installation.

Figure 6. CT assembly.