Ge energy, 2a dlynx, Non-isolated dc-dc power modules – GE Industrial Solutions 2A DLynx User Manual

Page 23: Datasheet, Surface mount information

Advertising
background image

GE Energy

Datasheet

2A DLynx

TM

: Non-Isolated DC-DC Power Modules

3Vdc –14Vdc input; 0.6Vdc to 5.5Vdc output; 2A Output Current


June 24, 2013

©2012 General Electric Company. All rights reserved.

Page 23

Surface Mount Information

Pick and Place

The 12V DLynx

TM

2A modules use an open frame construction

and are designed for a fully automated assembly process. The
modules are fitted with a label designed to provide a large
surface area for pick and place operations. The label meets all
the requirements for surface mount processing, as well as
safety standards, and is able to withstand reflow temperatures

of up to 300

o

C. The label also carries product information such

as product code, serial number and the location of
manufacture.

Nozzle Recommendations

The module weight has been kept to a minimum by using open
frame construction. Variables such as nozzle size, tip style,

vacuum pressure and placement speed should be considered
to optimize this process. The minimum recommended inside
nozzle diameter for reliable operation is 3mm. The maximum
nozzle outer diameter, which will safely fit within the allowable
component spacing, is 7 mm.

Bottom Side / First Side Assembly

This module is not recommended for assembly on the bottom
side of a customer board. If such an assembly is attempted,

components may fall off the module during the second reflow
process. If assembly on the bottom side is planned, please
contact GE Energy for special manufacturing process

instructions.

Only ruggedized (-D version) modules with additional epoxy will
work with a customer’s first side assembly. For other versions,

first side assembly should be avoided

Lead Free Soldering

The 12V DLynx

TM

2A modules are lead-free (Pb-free) and RoHS

compliant and fully compatible in a Pb-free soldering process.
Failure to observe the instructions below may result in the

failure of or cause damage to the modules and can adversely
affect long-term reliability.

Pb-free Reflow Profile

Power Systems will comply with J-STD-020 Rev. C
(Moisture/Reflow Sensitivity Classification for

Nonhermetic Solid State Surface Mount Devices) for both

Pb-free solder profiles and MSL classification procedures.

This standard provides a recommended forced-air-
convection reflow profile based on the volume and

thickness of the package (table 4-2). The suggested Pb-
free solder paste is Sn/Ag/Cu (SAC).

A 6 mil thick stencil is

recommended.
For questions regarding Land grid array(LGA) soldering, solder

volume; please contact GE Energy for special manufacturing
process instructions.

The recommended linear reflow profile using Sn/Ag/Cu

solder is shown in Fig. 51.

Soldering outside of the

recommended profile requires testing to verify results
and performance.

MSL Rating

The 12V DLynx

TM

2A modules have a MSL rating of 2a.

Storage and Handling

The recommended storage environment and handling
procedures for moisture-sensitive surface mount
packages is detailed in J-STD-033 Rev. A (Handling,

Packing, Shipping and Use of Moisture/Reflow Sensitive
Surface Mount Devices). Moisture barrier bags (MBB)

with desiccant are required for MSL ratings of 2 or
greater. These sealed packages should not be broken
until time of use. Once the original package is broken,
the floor life of the product at conditions of

≤ 30°C and

60% relative humidity varies according to the MSL rating
(see J-STD-033A). The shelf life for dry packed SMT
packages will be a minimum of 12 months from the bag
seal date, when stored at the following conditions: < 40°
C, < 90% relative humidity.

Per J-STD-020 Rev. C

0

50

100

150

200

250

300

Reflow Time (Seconds)

R

efl

ow

T

em

p

C

)

Heating Zone
1°C/Second

Peak Temp 260°C

* Min. Time Above 235°C
15 Seconds

*Time Above 217°C

60 Seconds

Cooling
Zone

Figure 51. Recommended linear reflow profile using
Sn/Ag/Cu solder.

Post Solder Cleaning and Drying Considerations

Post solder cleaning is usually the final circuit-board
assembly process prior to electrical board testing. The
result of inadequate cleaning and drying can affect both
the reliability of a power module and the testability of the
finished circuit-board assembly. For guidance on
appropriate soldering, cleaning and drying procedures,
refer to Board Mounted Power Modules: Soldering and
Cleaning
Application Note (AN04-001).

Advertising