3. Installation

3.1 Installation Method

Please follow the installation procedure described as follows. Please install or detach the option after turning off
the input power supply of the inverter and confirming the charge lamp (CHARGE or CRG) is gone out.

The shape, the dimensions and the position of the charge lamp of the inverter are different by each capacity.

Inverter unit

Top cover

keypad

Charge lamp

Inverter unit

PE Line

Option unit

keypad

Step1

Step2 to 4

Secure the keypad panel to the option unit with two screws at b.

Step4

Step1

Step2

Step3

Loosen two screws(M4) at a and remove the top cover. Loosen two screws(M3) at b and detach
the keypad panel. (For the 30kW[40HP] and above inverters, the keypad panel can be detached if
the front cover is removed and the screws loosened at b.)

Connect the ground cable to the PE terminal of the option unit.

Reassemble the top cover, push-in the option unit and secure it with two screws(M3) at c.