3.2 Installation Checklist
After installation and wiring, check the following items.
[1] The wiring is correct.
[2] No loose wires or screws remain inside the Inverter.
[3] The screws and terminals are all tight.
[4] There are no loose threads of wires at terminals that may contact other terminals.
[5] The switch positions on the Anybus-S module, JP6 on the conversion-board are suitable for the
use purpose. (Do not change the JP4 on the conversion-board !)
[6] Inverter parameters such as H30, o27, o28, o30 to o38, are set correctly. (H30: Link
Active/Inactive, o27 and o28: for RAS)