2 installation checklist – GE Industrial Solutions AF-300 P11_G11 Metasys N2 User Manual

Page 7

Advertising
background image

USER MANUAL

Revision 1.01

2000-11-06

HMS INDUSTRIAL NETWORKS AB

7

3.2 Installation Checklist

After installation and wiring, check the following items.

[1] The wiring is correct.

[2] No loose wires or screws remain inside the Inverter.

[3] The screws and terminals are all tight.

[4] There are no loose threads of wires at terminals that may contact other terminals.

[5] The switch positions on the Anybus-S module, JP6 on the conversion-board are suitable for the

use purpose. (Do not change the JP4 on the conversion-board !)

[6] Inverter parameters such as H30, o27, o28, o30 to o38, are set correctly. (H30: Link

Active/Inactive, o27 and o28: for RAS)

Advertising