DC OEM MODULE FOR USE WITH GERAPID CIRCUIT BREAKERS

APPENDIX H Field Test Procedure.

46

Design and specifications are subject to change without notice

S47183Ee rev.01 2011-04-26

Table H-6 High Potential Tests for the module and the trolley

Step

Starting Status

Check Points

Pass Criteria

2.1

Trolley is at CONNECTED position.
CLOSE the breaker.

Apply 3.9 kV DC or 2.8 kV RMS for 60 seconds between main
connectors and frame
.

No flashover.

2.2

Trolley is at CONNECTED position.

Breaker is OPEN.
Connect BOTTOM connector with frame.

Apply 3.9 kV DC or 2.8 kV RMS for 60 seconds between TOP main
connector and frame

No flashover.

2.3

Trolley is at CONNECTED position.
Breaker is OPEN.
Connect TOP connector with frame.

Apply 3.9 kV DC or 2.8 kV RMS for 60 seconds between BOTTOM

main connector and frame

No flashover.

2.4

END OF PROCEDURE.

Rear view on the bus bars compartment.

Main TOP connector

Main BOTTOM connector

Step 2.2

Step 2.3