Table H-7 High Potential Tests for control and auxiliary circuits

Step

Starting Status

Check Points

Pass Criteria

3.1

Trolley is at TEST position.
Breaker is OPEN.
Connect all control wires together.

Disconnect all earthing wires.

Apply 3.9 kV DC or 1.2 kV RMS for 60 seconds between

wiring harness and frame.

No flashover.

3.2

END OF PROCEDURE

Table H-8 Grounding Circuit Tests

Step

Starting Status

Check Points

Pass Criteria

4.1 Trolley

WITHDRAWN

a. Check mounting screws of end switches no: 33-

1 / 33-2 / 33-3 / S4F / 33-4 / 33-5,

b. Check door locks of the control compartment,
c. Check end switch S3F under the trolley.

Grounding path resistance,

between main ground bus

and measured point, must
be less 0.1 Ohm.

4.2

Rack-in the trolley into TEST
position.
Connect Secondary Plug (g), Fig. H-
2.

a. Check the motor drive’s housing,
b. Check breaker’s grounding point at –X2:3,
c. Check door locks of the trolley,

d. Check handles at the front of the trolley.