Brickcom CB-500A User Manual

Page 76

Advertising
background image


- 69 -


i. An event schedule can be programmed to recur at different times

according to the user’s needs. Select the days for the event schedule to

occur. Select a start time and specify the duration.

3. Define what will trigger an event to occur by selecting an option from the Event

drop-down list.

4. Select the Actions that will occur when the event is triggered.

Advertising
This manual is related to the following products: