Set the axle weldment up on blocks. Insert four digistar weigh bars. Use 1” x 6” bolts to attach weigh

bars to axle weldment. Make sure that the arrows on all of the weigh bars are pointing up. Attach

the scale bar mounts to the weigh bars using 1” x 5” bolts. Be sure to use correct scale bar mounts in

correct positions. Use (8) 1” center locking nuts on the bolts.

1”x 5” Bolt

1”x 5” Bolt

1”x 6” Bolt

1” Center Locking Nut

Left Scale Bar Mount

Right Scale Bar Mount

Axle Weldment

M24 Lock Nut

Set the main frame onto the scale axle using an overhead hoist. Line up the holes and bolt together using

(12) M24 x 75 MM hex cap screw bolts and (12) M24 nylon locking hex nuts. Make sure scale wires are