Gc24 – J&M GC-24T Assembly User Manual

Page 38

Advertising
background image

GC24

t

-1 G

rain

C

art

a

ssembly

-38-

STEP - 73

STEP - 72

Install the auger top tube assembly and pivot pin with 1/2” x 1-1/2” bolts, extra large washers

and lock nuts. Be sure to match numbers that are welded on the hinge plates of both the bottom

and top tub assemblies (if top tube has a 7 it goes with the bottom tube that has a 7).

Install the adjustable auger rest pad. First install the adjustable auger bolt on rest plate. Use (4) M10 x 25

MM serrated hex head bolts and (4) M10 serrated hex flange nuts. Next attach the adjustable auger rest.

Use (2) M10 x 40 MM, (2) M10 nylon washers, and (2) M10 serrated hex flange nuts. The washers go onto

the slotted side.

Adjust auger rest pad. Move

the rest pad up or down until

both circled points in the im-

age above are touching the

rest pad. Then drill through

the shell in the remaining

holes. Use (4) M10 x 40 hex

bolts and (4) M10 nylon

locking hex nuts.

Advertising