J&M GC-24T Assembly User Manual

Page 42

Advertising
background image

-42-

GC24

t

-1 G

rain

C

art

a

ssemBly

STEP - 80

Install the wheels and tires with 3/4” lug nuts. Be sure to tighten and monitor lug nuts to make sure that

they are always tight.

For a complete sealed cart, use polyurethane or caulking around the seams between panels. It is recom-

mended to prevent any water damage or leaking by using caulking or polyurethane over all seams between

panels. Apply caulking to the outside of the cart.

s

ealinG

the

C

art

Advertising