J&M GC-24T Assembly User Manual
Page 42
Advertising
-42-
GC24
t
-1 G
rain
C
art
a
ssemBly
STEP - 80
Install the wheels and tires with 3/4” lug nuts. Be sure to tighten and monitor lug nuts to make sure that
they are always tight.
For a complete sealed cart, use polyurethane or caulking around the seams between panels. It is recom-
mended to prevent any water damage or leaking by using caulking or polyurethane over all seams between
panels. Apply caulking to the outside of the cart.
s
ealinG
the
C
art
Advertising