J&M GC-24T Assembly User Manual

Page 40

Advertising
background image

GC24

t

-1 G

rain

C

art

a

ssembly

-40-

STEP - 77

STEP - 76

Install the PTO slip clutch assembly. The PTO shaft will need to be shortened depending on the distance

between the tractor PTO shaft and the cart drive line shaft.

Install the junction box and display screen mounts. Use (4)M10 x 25 MM bolts to mount them both.

Install the battery box walls with (2) M10 x 25 Serrated hex head bolts and (2) M10 nylon locking nuts.

Next install the battery box strap with (2) M10 x 50MM hex bolts and (2) nylon insert locknuts. Now

install the scale monitor bracket with (2) M6 x 20MM hex head bolts and (2) M6 nylon locking nuts.

Next attach the scale monitor using (2) M6 x 20MM hex head bolts and (2) M6 nylon locking nuts. Fin-

ish the battery box with attaching the chord wrap with (2) M10 x 25MM serrated hex head bolts and (2)

M10 locking nuts. Next attach the junction box to the junction box mount using (4) M5 x 20 hex head

bolts and (4) M5 locking nuts.

s

cale

o

ption

Advertising